
Filtered water is dosed with ozone to oxidise taste and odour toxins before being filtered through bacterial activated carbon (BAC) filters.
Water from a holding dam is coagulated with alum and flocculated prior to being gravity fed through 8 dual media in filter DAFF trains.
Water from a local dam is coagulated with alum and flocculated prior to being gravity fed through a 10 mono media in filter DAF. Project included chemical dosing, and sludge thickening via a thickener and centrifuge.
Water sourced from Stoney creek is coagulated with alum and flocculated prior to being gravity fed through 3 dual media in filter DAFs. Project included pre ozone dosing on the raw water and waste water handling.
Landershute WTP
– 140ML/day Ozone
Dosing and
BAC Filters Description

Plant Commissioned: 2003
Client: Maroochydoore Water Board
Googong WTP
– 90 ML/day DAFFDescription

Plant Commissioned: 2004
Client: ACTEW
Sri Lanka
– 68 ML/day DAFF Description

Plant Commissioned: 2006
Client: Outokumpu / Ampara Water Board
Moorabool WTP
– 76ML/day DAFF Description

Plant Commissioned: 2001
Client: Barwon Water Treatment Australia
...